top of page

INSNRG

logo_0195009a0_2x.png
truck.png

14
Truck
Loads

pallets.png

Pallets

bays.png

26
Bays of
racking/ shelving

TRC were engaged by Insngr to relocate their Clayton factory and offices. 
The move included disassembly, transportation and reassembly of pallet racking including dyna bolting, the relocation of palletised stock, machinery, tools, furniture and production benches.

bottom of page