top of page

Swinburne University

swinburne-university-of-technology-7-log

250 PAX

M3

1150

Picture1.jpg

1632 Lineal Metres

Relocation Management

Picture6.png

Laboratories

TRC have been a preferred supplier of relocation services to Swinburne University across all campuses since January 2010. We successfully completed another Project for Swinburne University relocating over 350 Teaching and Administrative staff and 18 laboratories into the AMDC, a purpose-built building at their Hawthorn Campus. This was on the back of TRC managing the closure of the Prahran Campus. These projects required us to allocate a full-time Relocation  Manager to ensure downtime on current and on-going research as well as study projects was kept to a bare minimum.

We have also successfully completed the relocation for over 250 academic staff incorporating 1150 m3 of laboratory equipment, 1,632 lineal metres of libraries and files into the newly constructed Advanced Technology Centre at the University's Burwood campus.

6mths

bottom of page